Under the Prithvi Highway, traffic has been operated in one way from the Sotang river bridge located in Thackre rural municipality-7 of Dhading. Mangalkanar road was blocked for the whole day after the bridge collapsed. On Tuesday evening, only one-way traffic was started after the diversion was made.
Keshav Prasad Ojha, the head of Nagadhunga-Malekhu road plan eastern section, said that one-way traffic was brought into operation from the bridge on Tuesday night from 11:30 p.m. According to him, vehicles are driven one-way from the bridge and diversion. He says that
is being worked on in a two-way manner. "It was a problem for big trucks to drive through this bridge before," he said.
