Deep borings installed at the expense of lakhs are still standing

Boring dip has not been running for a long time due to non-payment of electricity tariffs in some places, consumers not taking electricity meters and authorities cutting the lines.

Shrawn 14, 2082

Santosh Singh

Deep borings installed at the expense of lakhs are still standing

We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:

This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.

Until a few years ago, paddy was cultivated in the vicinity by deep boring of Bhageswar pond in Jaleshwar. Boring is still there, but only a remnant. Boring is covered with garbage. Pump parts are stolen. The technical living room has become a haunt of gamblers and drug addicts.

Mohammad Safid Rain of Jaleshwar Sarika could not plant paddy this year on 10 kathas of land after boring was stopped. Not only Rain, but more than 50 bighas of the surrounding fields are fallow.

Underground Water Resources and Irrigation Development Division Office Mahottari installed the electric wire to run the deep boring. But due to lack of transformer and other equipment, the boring is not running. The fields of the farmers of Mahottari have become dry because the deep boring installed for irrigation cannot be used. Borings installed at the expense of lakhs are stuck.

Deep borings installed at the expense of lakhs are still standing

Engineer Amlesh Yadav of the Underground Water Resources and Irrigation Development Division Office, Jaleshwar, said that irrigation was affected when funds were collected from the consumers and not repaired.

Engineer Yadav informed that 23 deep borings installed by the division could not be put into operation due to electrification, general maintenance, transformer connection, pump repair, pipeline expansion, removal of old engines and new electrification.

In some places, electricity tariffs have not been paid, consumers have not taken electricity meters, the authority has cut the line and it has deteriorated due to the fact that it has not been running for a long time. "Consumers have not been active in running some boreholes," said Engineer Yadav, "Irrigation is being done in 980 hectares from 31 boreholes being connected and operated by the division office. But the 23 borings we installed are not operational. Borings that are not operational can be repaired and put into operation by spending 45 million.

According to him, each deep boring connected can irrigate an area of 20 to 40 hectares.

Deep borings installed at the expense of lakhs are still standing

Groundwater and Irrigation Development Division, Kamala Irrigation Management Office Portaha, Agricultural Mechanization Promotion Center Naktazhizh Dhanusha, state government, local government and non-governmental organizations have been installing deep boring in Mahottari.

Prime Minister KP Sharma Oli, who came to Mahottari on Friday, assured to install 500 deep borings immediately to solve the drinking water and irrigation crisis in Madhes. But currently, the deep borings that have been connected have not been able to operate.

Santosh

Link copied successfully