Due to the increase in the flow of water, the traffic in Dahare River was blocked

When it rains in Dahare river, the road gets lost when the river comes with black mud.

Bhadra 12, 2082

Santosh Mahatara

Due to the increase in the flow of water, the traffic in Dahare River was blocked

We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:

This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.

The road has been blocked in Dahare Khola of Ridi-Wami road section. The road was blocked in the Dahare River after the rains that had fallen since Thursday afternoon increased the flow of water. Narayan Prasad Adhikari, Chief Superintendent of Police, District Police Office, Gulmi informed that the road was blocked in Dahare Khola located in Satyavati Rural Municipality-6.

This is the Rudraveni-Wami section of the Butwal-Burtiwang road section. When it rains in Dahare river, the river comes with black mud and the road  It will disappear.

In this rainy season, the road has been blocked in Dahare river many times. Because of this, the passengers of public and private vehicles passing through this road have suffered. The concrete bridge under construction on this river has reached the final stage of construction and is stuck. Construction work has been started on the bridge, which was contracted without ensuring the budget, after the river washed away vehicles many times.

Santosh

Link copied successfully