We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:
This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.
A 65-km-long highway has been jammed as a vehicle stuck in the mud of the south road of East Nawalparasi under East-West Mahendra Highway could not be pulled out. The highway has been blocked since 30 hours ago.
The jam of vehicles traveling east-west through Mahendra Rajmarg has reached up to 65 km. There was a long traffic jam because the police had stopped the vehicle so that there would not be a rush of traffic.
There is a long jam on the highway from Badera in West Nawalparasi to Kawasoti in East Nawalparasi. Due to the rains, the passengers were suffering because the vehicles stuck in the swamps of Daunne could not move.
The car stuck in the mud of the road near the Vishwakarma temple in Daunne could not be pulled out for 30 hours. On Wednesday evening, after the highway dried up, one-way traffic was operated for a while, but at 8:30 in the night, due to the heavy rain, the highway was again blocked due to the vehicle getting stuck on the slippery road.
After allowing traffic to operate for about 2 hours on the diversion road of Binayi Khola on Wednesday evening, the police stopped the vehicle again. DSP Madhuacharya has issued a public notice on Thursday morning and has requested to travel by other highways due to the bad condition of the highway in Downe.
east-west train Butwal Pokhara via Muglin road and Kaligandaki road has been called upon for passengers. According to the police, when it rains, the road becomes slippery and the vehicle slips. Due to the demolition of the lower road section during the expansion, there has been a traffic jam for 30 hours due to the vehicles stuck there.
