Blocked road in Dumkibas after 10 hours operation after construction of diversion

Chaitra 30, 2081

Nabin Paudel

Blocked road in Dumkibas after 10 hours operation after construction of diversion

We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:

This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.

Under the east-west highway, the blocked highway has been operational for 10 hours in Dumkibas of East Nawalparasi. Saturday morning rains washed away the diversion on Vinayi River, causing traffic disruption.

After the water level in the river dropped, the new diversion  After the construction, the traffic was operated from 9 pm. Police Inspector Janak Banjara of the District Traffic Police Office said that one-way traffic was operated from the diversion.

Passengers who have been stuck for 10 hours are heading towards their destination. On the 26th of January, the bridge was washed away after an Indian wave carrying a heavy load hit the bridge in the Vinayi River in Dumkibas. A diversion was constructed after the bridge collapsed. 

Nabin

Link copied successfully