We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:
This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.
The suspension bridge of China Bagar, which was built about 38 years ago, is now dilapidated. At present, the common people are taking risks to travel on this bridge built over the river Bheri to connect Rukum and Jajarkot.
In this bridge connecting Saniveri Rural Municipality-2 and 1 Chinabagar in Rukum West and Bheri Municipality-1 Rimna in Jajarkot, along with people, two-wheeled vehicles have also been roped. Due to the lack of motor vehicles near this bridge, there has been more load on the bridge since motorcycles and scooters have been passing through it for the past decade. 
Tek Bahadur Pun, Ward President of Saniveri-1, said that this bridge was built in 2043. In many places, the mesh around the bridge has weakened and the lower wings have also fallen, so wood has been placed. But the local Purwan Wik said that the wood is weak and there is a risk. More than 100 people and about 10-15 bikes travel on this bridge every day. Everyone has had a hard time . But there was no solution," he said, "This bridge was repaired once many years ago. After that no one saw it .' 
Ward Chairman Pun said that the matter about the bridge repair was seriously raised in the municipality. He also said that the Karnali state government has allocated 20 lakh rupees for the bridge repair.
