After the rains, the road is blocked again

On the 14 km long road between Dumkibas in East Nawalparasi and Bardghat Bazar in West Nawalparasi, as soon as it rains, the problem of vehicles getting stuck is recurring.

Ashad 15, 2082

Narayan Sharma

After the rains, the road is blocked again

We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:

This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.

The Narayangadh-Butwal road section has come to a standstill again after the vehicle got stuck on the slippery road after the rain. Police Superintendent of East Nawalparasi Yadav Dhakal said that after the rain on Sunday morning, the vehicle got stuck in the river and the vehicle was stopped. According to the police, the traffic was blocked after 12 am.

According to Dhakal, a cargo truck is stuck near the Vishwakarma temple on the southern road section. As a result, the two-way traffic has been stopped . 

Between Dumkibas in East Nawalparasi and Bardghat Bazar in West Nawalparasi, the 14-km-long down road gets stuck in mud as soon as it rains and the traffic stops. 

Although the Chinese contractor company China State Engineering Corporation took over the work of upgrading the highway, it has not been able to complete the road upgrade for 6 years.

Narayan

Link copied successfully