We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:
This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.
A diversion has been carried out by the flood in Dumkibas of East Nawalparasi under the East-West highway. The diversion constructed in Vinayi River was washed away by last night's water.
After the closure of the road, passenger vehicles and small vehicles have been operated through an alternative road through the Hongsi Gate. DSP Madhu Nepal of the District Police Office said that the large cargo vehicles were stopped in Dumkibas and Arunkhola areas.
Due to the rain, the road in Daunne was slippery and the vehicle could not go uphill. Because of this, there is a long traffic jam in the downstream section. After the bridge collapsed due to the impact of the Indian wave of overload on 26th of January, the traffic has been operating through diversion.
After the road was blocked Passenger vehicles and small vehicles are to From Hongsi Gate, one has to travel through North Sardi via a circuitous alternative route of about 25 km.
