We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:
This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.
The suspension bridge of Puchighat connecting Khandadevi Rural Municipality of Ramechhap and Sunkoshi Rural Municipality of Sindhuli has been temporarily repaired. With the onset of the rainy season, the locals are happy that the bridge has been repaired.
Due to the incessant rain last October, the bridge was completely damaged due to the flood in Sunkoshi River, and the locals were facing difficulties for nine months to cross the Sunkoshi River.
30 meters of the 180 meter long bridge connecting Puchighat of Khandadevi Rural Municipality-4 and Sunkoshi Rural Municipality-6 Chainpur of Sindhuli towards Ramechhap was completely damaged by the flood. To facilitate the movement of students, employees and farmers, the disaster management fund of Khandadevi rural municipality has Gyan Kumar Shrestha, Chairman of Khandadevi Rural Municipality, said that the bridge was temporarily repaired at a cost of 450,000.
Technical Harishchandra Baral said that because the suspension bridges of Kothwe, Belghari and other places under this rural municipality were only partially damaged, local resources were mobilized and put into operation after repair.
After the repair of the bridge, Khandadevi-4 went to study in the long-term school of Sunkoshi Rural Municipality. More than two dozen children, most of the farmers who go to cultivate in Khalte and Khandadevi from Khalte To the rotating staff Local Indra Bahadur Shrestha said that it was very easy.
