Bailbridge in operation at Larcha

Ashad 6, 2082

Anish Tiwari

Bailbridge in operation at Larcha

We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:

This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.

A Beilibridge has been put into operation on Friday at Larcha on the twelve-bay Tatopani (26 km) road section connecting Sindhupalchok to China with the northern border of Tatopani. Since the floods in October of last year washed away the Larcha Belibridge, a dangerous road was operated by placing a hump pipe in the Bhotekosi river.

According to the Charikot road division office, the 54 meter long belay bridge was installed and operated within one and a half months with a budget of 1 crore 7 million. Sowarna Construction Services and Creative Construction and Suppliers have prepared Beilibridge. Arjun Thapa, head of Sowarna Construction Services, said that they worked hard day and night to complete the Belibridge work before the rainy season. "Starting from March 15, the Belybridge was installed in the third week of May," he said. 

The only road of Bhotekosi Rural Municipality Ward No. 2, 3 and 4 has been built on the Fulpingside of the motorable bridge damaged by the landslide.

Anish

Link copied successfully