One-way traffic operation at Downne

Vehicles halted at Kawasoti and Bardghat have been sent to their destination to avoid long traffic jams, the road near Vishwakarma temple was washed away.

Shrawn 20, 2082

Narayan Sharma

One-way traffic operation at Downne

We use Google Cloud Translation Services. Google requires we provide the following disclaimer relating to use of this service:

This service may contain translations powered by Google. Google disclaims all warranties related to the translations, expressed or implied, including any warranties of accuracy, reliability, and any implied warranties of merchantability, fitness for a particular purpose, and noninfringement.

One-way traffic has started in Downe under the Mahendra Highway, which has been blocked for the last 38 hours due to rain.

According to the police station officer, after the rain stopped, the road was opened for one-way traffic from a while ago. At 5 places in Downe, the road is one-way operation, traffic has been opened alternately with the presence of police.

In order not to have a long jam in Daunne, long vehicles stopped at 30 East Kawasoti from Dumkiwas have been sent to their destination. The highway was blocked near the Vishwakarma temple, 3 km west of Dumkiwas market due to landslides. Traffic was opened after making the highway smooth by placing gravel in the flooded areas.

Three months ago, there was a problem with the vehicle getting stuck there due to the soil of the hole dug to build the bridge. As there is a steep hill, the vehicle is pushed by a dozer to cross it. Due to water flowing on the highway near Vishwakarma temple, it is difficult to drive.

Because the Chinese contractor company China State Engineering Corporation, which has taken the contract for the construction of the highway, has not worked on the road, the highway is blocked even in normal rains.

Between Dumkiwas and Bardghat, there is a hill on the 14 km road. Vehicles traveling east-west are stuck in a traffic jam. In order to avoid a long traffic jam at Downe, the cars stopped at Kawasoti and Bardghat have been sent to their destination, so there is a long traffic jam at Downe. The police said that the vehicle can be crossed in 3-4 hours.

Narayan

Link copied successfully